Method first, signage second
Signage manages the period while a floor is drying. The method determines how long that period is and how slippery the surface becomes. A flood-and-mop approach in an entry lobby creates a large wet area for a long time, whereas a controlled method with proper water management creates a smaller one that dries faster. Choosing the method is the primary control; the sign manages what remains.
Timing sits alongside it. Cleaning a public entrance at the busiest moment of the day guarantees exposure regardless of signage. Where the building's pattern allows, wet work should sit outside peak movement, and where it does not, the method should change rather than the risk being absorbed. The scope should record the intended timing so a later schedule change does not quietly reverse the decision.
