Why generic topics fail
A briefing on manual handling delivered because it is March, to a crew that has not lifted anything unusual, is an administrative act. The same briefing delivered the week after a cleaner strained a shoulder emptying a particular bin, with a change to that bin's size, is a control. Same topic, entirely different value, and only the second produces a record worth reading.
Generic programmes also crowd out the specific. Twelve scheduled topics a year consume the available attention and leave no room for the issue that actually arose in week three. A better structure is a small number of standing topics plus space for whatever the site is producing, which is what makes the programme responsive rather than ceremonial. A shorter programme also leaves room for the briefing that follows an actual event, which is the one most likely to change how a task is performed.