The site's rules come first, not the cleaning routine
In an office the contractor proposes the method. On a production floor the site usually has one, derived from its product requirements, its customers' expectations and its own quality system. The contractor's job is to work inside that framework, which means asking for it before pricing rather than discovering it during induction. A scope written without it will need rewriting. Sites that supply their rule set at enquiry stage also receive a more accurate price, since the contractor is not building in a margin for unknown constraints.
The rules commonly cover what may be brought onto the floor, which is where general cleaning practice most often conflicts. Some sites restrict certain materials, fibres, or product types entirely, or require equipment to be dedicated to the area and never removed. Those constraints change the equipment list and sometimes the cost, and they should be known before a price is agreed.